Company - Leixlip Specialist Clean Room Project by HuntOffice Interiors Project Details: This was a specialist job where we were tasked with the design and build of a new Clean Room for the inkjet factory floor in Celestica's Leixlip plant. Scope of works: We were responsible for the design and build of a brand new clean room on the plant floor of Celestica's Leixlip plant. This required a jumbo stud wall build with integrated with glazed units and sealed doors and frames. The entire room had to be drylined and plastered and paints. Once finished the room had to be air tested. Project Detail & Scope of Works: • Design & Build new Clean room for production plant • Jumbo stud wall built • Glazed Units • Sealed doors & frames • Drylined and plastered • Painted • Air pressure tested Timeline: This project was completed on time and in budget. |
Celestica - Technology Manufacturing Company - Leixlip Specialist Clean Room Project By Huntoffice Interiors
Arrange a callback or Tel: 08445 443558
|
Product Specification
- Product Code
- H44105690
Product Details
- Celestica - Technology Manufacturing Company - Leixlip Specialist Clean Room Project By Huntoffice Interiors
Celestica Project – Celestica Specialist Clean Room Fitout Project
Project: Celestica - Technology Manufacturing Company - Leixlip Specialist Clean Room Project by HuntOffice Interiors
Project Details: This was a specialist job where we were tasked with the design and build of a new Clean Room for the inkjet factory floor in Celestica's Leixlip plant.
Scope of works: We were responsible for the design and build of a brand new clean room on the plant floor of Celestica's Leixlip plant. This required a jumbo stud wall build with integrated with glazed units and sealed doors and frames. The entire room had to be drylined and plastered and paints. Once finished the room had to be air tested.
Project Detail & Scope of Works:
• Design & Build new Clean room for production plant
• Jumbo stud wall built
• Glazed Units
• Sealed doors & frames
• Drylined and plastered
• Painted
• Air pressure tested
Timeline: This project was completed on time and in budget.