You're here :  Interiors  /  Fit Out Projects  /  Complete Office Fitouts  /  PSE Power Systems Office Refurbishment by HuntOffice Interiors

PSE Power Systems Logo

 
Request a Quote
 
 

Project: PSE Power Systems Office Refurbishment

Project Details: The full scope of works includes removal of existing partition walls and creating an open plan office space with a breakout meeting area. The office and meeting room breakout area interior solutions include electrical works, ceiling installation and carpet tile replacement. Both, office and meeting room areas were supplied with furniture, presentation and IT equipment.

Project time scale: 2 days – completed on time and on budget.

Detailed scope of works:

• Removal of the partition walls
• Installation of suspended ceiling systems
• Re-wiring and other electrical works
• Carpet tile replacement
• Office furnishing: desking, storage and seating solutions
• Furnishing of the meeting room breakout area with tables, chairs and dividing frosted screens
• Installation of presentation equipment for the meeting area
• Supplying and installing technology products and office machines
• Reception Unit

PSE Power Systems Office Refurbishment by HuntOffice Interiors


See more details about this product

Arrange a callback or Tel: 1890 77 11 00

Complete Office Fitouts See More Options in Complete Office Fitouts »

Product Specification

Product Code
pse-project

Product Details

- PSE Power Systems Office Refurbishment by HuntOffice Interiors

 PSE Project: PSE Power Systems Office Refurbishment

 

PSE Logo



Project: PSE Power Systems Office Refurbishment

Project Details: The full scope of works includes removal of existing partition walls and creating an open plan office space with a breakout meeting area. The office and meeting room breakout area interior solutions include electrical works, ceiling installment and carpet tile replacement. Both, office and meeting room areas were supplied with furniture, presentation and IT equipment.

Project time scale: 2 days – completed on time and on budget.
 

 

Detailed scope of works:

• Removal of the partition walls
• Installment of suspended ceiling systems
• Re-wiring and other electrical works
• Carpet tile replacement
• Office furnishing: desking, storage and seating solutions
• Furnishing of the meeting room breakout area with tables, chairs and dividing frosted screens
• Installation of presentation equipment for the meeting area
• Supplying and installing technology products and office machines
• Reception Unit

pse reception-fitout by huntoffice interiors PSE fitout boardroom refurbishment by Huntoffice Interiors  PSE office fitout desking

Product Reviews
View Expert Product Reviews reviews submitted by industry experts
View Customer Product Reviews reviews submitted by regular visitors who have used this product

Send to friend?

Send this Product Page to a friend? click here »
: *
: *
: *
 

PSE Power Systems Office Refurbishment by HuntOffice Interiors